Indoor negative ion construction operation flow

1. Do a deep cleaning, wipe the surface of the object and keep it clean.

2. Cover all electrical, metal, glass, and furniture surfaces with a masking mask.

3. Construction management personnel must wear work clothes, masks, gloves, and foot covers, and place SKYISH construction cards in the construction area.

4. Pour the negative ion treatment solution into the electric/manual watering can. According to every 30 square meters, the watering can must be cleaned with water before use. No other liquids may remain.

5. The use of electric watering can for construction management, only the ceiling, wall, furniture back spray, no need for space atomization. Spray evenly from top to bottom and from front to back.

6.spray treatment solution should pay attention to the amount, to form a layer of water mist as the standard, if there is water droplets dripping, need to use a towel to rub evenly.

7. Wipe the glass, electrical appliances, metal, and seat with a wet towel.

8. After the construction is completed, seal for 120 minutes, clean the masking film, and then open the window for 7 days.

9. After 7 days, it can be detected by negative ion detector, which can generally reach 3000 negative ions/CM3.

 

Negative ion construction operation process in the car

1. Do a deep cleaning, wipe the surface of the object and keep it clean.

2. Cover the glass, central control screen, electrical appliances and metal parts with a mask.

3. Construction management personnel must wear work clothes, masks, gloves, and foot covers, and place SKYISH construction cards in the construction area.

4. Pour the negative ion treatment solution into the manual watering can, according to the five-seater 200ML/set, and the seven-seat 300ML/set. The hand watering can must be cleaned with water before use, and no other liquid remains.

5. Using hand sprayer for construction management, spray distance as far as possible to maintain a vertical distance of about 40-60cm, evenly sprayed to the ceiling of the roof, the foot of the car and the carpet, other places do not need.

6. Spray treatment solution should pay attention to the amount, to form a layer of water mist as the standard, if there is water droplets dripping, need to use a towel to rub evenly.

7. Wipe the glass, central control screen, electrical appliances, metal, and seat with a wet towel.

8. After the completion of the construction, open the inner circulation hot air for 30 minutes and seal for 30 minutes, then close the hot air and seal for 60 minutes, and seal for 90 minutes.

9. After 90 minutes of sealing, open the door and ventilate for 30 minutes.

10. And then use the negative ion detector to detect, generally can reach 5000 negative ions / CM3. (The detection effect is better in 24 hours.)

 

Next article we will introduce Negative oxygen ion quantum coating construction tips

If you want to know more about negative oxygen ions, please click on the link⇒: https://www.hiskyish.com/shop/skyish-negative-oxygen-ion-liquid-quantum-coating-air-freshener-for-room-car-home/